Cart:

0

Home  |   Sign In   |   Register

Currencies:  

NY-14-C049 -- Working with Constraints: An Interstate Tunnel Retrofit

Click to enlarge
Payment Option:

Availability: In stock

$8.00

Model: NY-14-C049 -- Working with Const

Documentation
Add to Cart:   

NOTE: Our website provide PDF immediately download,sometimes when you purchased can't online download please contact us,we will send the document to you with email.

NOTE: in order to view PDFs you will need to have the FREE Adobe® Reader® installed, click the ""

CONFERENCE PROCEEDING published 2014 by ASHRAE

Written By David G. Newman, PE, CEng; Hing-Wai Wong


Product Details

Published: 2014
Number of Pages:8
File Size: 1 file , 2.6 MB
Product Code(s): D-NY-14-C049


Full Description

The retrofitting of a new tunnel ventilation system within an existing structure typically presents constraints around which the design mustbe engineered. This paper presents an example of such a retrofit design in which the ventilation capacity of an existing interstate tunnel issubstantially increased to address present-day life-safety requirements. A number of design alternatives are identified and evaluated leading to theselection of a preferred concept. The paper discusses the constraints encountered, and outlines the measures taken to mitigate them in order tomaximize the performance of the new tunnel ventilation system.

Citation: ASHRAE Papers CD: 2014 ASHRAE Winter Conference, New York, NY

Our all standard are Electronic version in pdf,After you paid,you can download the standard in pdf.The standard no limit,can print,can share,can open in any computer!



Featured Products: ASME B31.3 , ASME B31.1 , ASME A17.1 , ASME Y14.5 , ASME B16.34 , ASME B16.9 , ASME B16.5 , ASME B31.9 , AWS D1.1/D1.1M , AWS D1.6/D1.6M , AWS D17.1/D17.1M , API STD 650 , API STD 1104 , AAMI HE75-2009 , AASHTO GDHS-6 , AGA Report No. 9 (XQ0701) , ASCE 7-10



Recommend Products

IPC A-620B
IPC A-620B
$70.00