Cart:

0

Home  |   Sign In   |   Register

Currencies:  

Technical vs. Process Commissioning: Design Phase Commissioning

Click to enlarge
Payment Option:

Availability: In stock

$4.00

Model: Technical vs. Process Commission

Documentation
Add to Cart:   

NOTE: Our website provide PDF immediately download,sometimes when you purchased can't online download please contact us,we will send the document to you with email.

NOTE: in order to view PDFs you will need to have the FREE Adobe® Reader® installed, click the ""

JOURNAL ARTICLE published 2014 by ASHRAE

Written By By Dave McFarlane; Thomas Farmer, P.E.

Product Details

Published: 2014
Number of Pages:6
File Size: 1 file , 90 KB
Product Code(s): D-AJ14Feb04

Full Description

During design phase commissioning, the commissioning authority carefully ensures that every element of the Owners Project Requirement (OPR) document is accounted for in the building’s schematic design, which is the first stage of the design process. This article is part of a series explaining the differences between technical and process commissioning.

Citation: ASHRAE Journal, vol. 56, no. 2, February 2014

Our all standard are Electronic version in pdf,After you paid,you can download the standard in pdf.The standard no limit,can print,can share,can open in any computer!



Featured Products: ASME B31.3 , ASME B31.1 , ASME A17.1 , ASME Y14.5 , ASME B16.34 , ASME B16.9 , ASME B16.5 , ASME B31.9 , AWS D1.1/D1.1M , AWS D1.6/D1.6M , AWS D17.1/D17.1M , API STD 650 , API STD 1104 , AAMI HE75-2009 , AASHTO GDHS-6 , AGA Report No. 9 (XQ0701) , ASCE 7-10